PORTFOLIO
Recruitment & Manpower Supply
Supplied various skilled & unskilled workers to the following companies:
-
BGP Arabia Co. Ltd.
-
Arabian Geophysical & Surveying (ARGAS)
-
SINOPEC International Petroleum Service Corporation
-
Saudi BinLadin Group (Operations & Maintenance)
-
King Fahd Causeway Authorities (KFCA)
-
Ballast Nedam Groep N.V
-
Al Rammah Int'l Telecommunications & Information Systems Services
-
Bin Quraya Est.
-
Tecnicas Reunidas Gulf Co. Ltd.
-
Fanar Al Jubail Industrial Services Est.
-
Eram Contracting Co.
-
Mana H. Al Mahthel General Cont. Est. (MMHM)
-
SM Powertech Co. Ltd.
-
ATLAS Transport, Contracting and Mechanical Services Co.
Telecommunication & Networking
-
Excavated and laid cable sleeves for security cameras at King Fahad Causeway
-
Excavated and laid cable sleeves for fibre for Mobily
-
Supplied and Installed several network nodes at BRF Buraidah cold storage facility
-
Pulled network cables at BRF Al Joody factory
-
Supplied and installed Aruba access points at BRF Al Joody factory
-
Structured cables for access control devices at BRF Al Joody factory
-
Supplied Various IT and Telecom products to multiple clients
Construction & Maintenance
-
Constructed a two story office building in the customs area at King Fahad Causeway
-
Constructed toilets in the cargo area at King Fahad Causeway
-
Extended King Fahd Causeway's toll gate
-
Inter flooring of the existing office building at King Fahad Causeway
-
Made an entire new asphalt road for VIP passengers from Saudi side to Bahrain side at King Fahad Causeway
-
Constructed immigration and custom Cubicles on the VIP road at King Fahad Causeway
-
Asphalted 500 Sqm area, with entrance and exit for a drive thru Coffee shop for Derby Coffee International
-
Constructed a drive thru coffee shop for Derby Coffee International
-
Carried small decor jobs throughout King Fahd Causeway island including making of fountains, small gardens & creative designs on sidewalks etc
-
Installed fence in custom and cargo area at King Fahad Causeway
-
Pulled Electric Cables from main source to various destinations at King Fahad Causeway
-
Made pre-cast concrete pulling pits to be laid along the 27 km long bridge at King Fahad Causeway
-
Made heavy and light duty manholes for cargo and custom's area at King Fahd Causeway
-
Laid platform and supplied electricity for X-Ray machines for Saudi customs at King Fahad Causeway
-
Made several offices at VIP area for custom and immigration department at King Fahad Causeway
-
Modified ladies inspection rooms in Custom Departure and arrival at King Fahad Causeway
-
Maintenance and modification works for Airplane Shelters at Dhahran Airbase
-
Made re-enforced concrete slabs for wooden huts at Half Moon Beach
-
Constructed several houses & villas for private sector